  Client / Project Description Location Value Completion
  Bunbury Port Concentrate Storage Facility Design and construction of 30,000t concentrate storage facility including concrete and steel building, conveyor loadout equipment, electrical and instrumentation control systems, dust control and sampling equipment. Bunbury, WA $8.4m Feb 2009
Kingston Primary School Four general learning teaching blocks, administration block, library block and covered assembly building, together with associated civil, irrigation and landscaping works. Kingston, WA $9.8m Jan 2009
Riverview Aged Care Facility 64 bed aged care facility incorporating 14 bed dementia wing, communal servery and kitchens, commercial kitchen, communal lounge and activity areas, in-house laundry facilities, administration area, reception area, landscaping, on-site parking facilities and associated civil and drainage works. Collie, WA $11.0m Dec 2008
Bunbury Library Two-storey building comprising Bunbury City’s new 1600m2 library plus a commercial tenancy and data centre, including carparking and major siteworks. Bunbury, WA $9.0m Dec 2008
Bunbury Regional Prison 72 bed extension for minimum security prisoners, administration blocks and general facilities, as well as upgrade to existing facilities. Bunbury, WA $16.0m Sept 2008
Dunsborough Centrepoint Shopping Centre 700m² extension to Coles Supermarket including new bakery and deli areas at Dunsborough Centrepoint Shopping Centre. Dunsborough $2.0m Sept 2008
BP Kwinana Refinery
Central Control Building
Extension to the existing Central Control Building included concrete and steel structure and fit out. Kwinana $2.4m July 2008
Ravensthorpe Nickel
Operations Centre & Laboratory
Operations Centre: precast concrete wall panels, as well a steel framed metal clad structure on an insitu concrete floor slab. Building area: 2045 m².
Laboratory: steel framed metal clad structure on an insitu concrete floor slab. A full Building Management System was installed, including Direct Digital Control. Airconditioning was a central chilled water system.
Ravensthorpe, WA $12.0m Prior June 2007
Worsley Alumina
Central Control Building
The main building structure consists of structural concrete columns and suspended slab at ground floor level, with structural steel at first floor level. Ceilings to the first floor are constructed of lightweight fire rated compressed straw Ortech ceiling panels. Internal walls are a combination of standard plasterboard construction and Speed panel, which are roll formed, galvanized steel panels filled with aerated concrete. Formwork systems and design were planned to minimize working at heights and reduce the time taken to form the suspended slab and beams. The services installation also caters for significant future growth and technological changes. Worsley, WA $8.0m Prior June 2007