Client / Project |
Description |
Location |
Value |
Completion |
| Construction |
Oil & Gas |
| KJVG / Chevron |
Gorgon Barrow Island - Design, detail, supply, fabrication, installation, testing and pre-commissioning of the refurbishment to an existing tank, including the provision of a new chemical dosing and overfill protection system. The works include the demolition of the existing tank roof, the replacement of the tank floor and annular ring and the supply and installation of a new liner. |
Barrow Island, WA |
$12.0m |
August 2010 |
| KJVG / Chevron |
Gorgon Henderson - Design, fabrication and construction of 16 API650 utility tanks for the Gorgon Project. Tanks designed, fabricated and erected offsite at the Australian Marine Complex and are then shipped to site as a complete unit for installation by others. |
Henderson, WA |
$9.6m |
August 2010 |
| Dampier to Bunbury Natural Gas Pipepine (DBNGP) |
DBNGP ME&I Stage 5B Expansion Project - Various compressor stations from Dampier to Bunbury (nine in total). |
Dampier to Bunbury, WA |
$40.0m |
March 2010 |
| NewGen Neerabup |
Neerabup Gas Fired Powerstation – Compressor installation and inlet facility. |
Muchea, WA |
$8.0m |
August 2009 |
| McConnell Dowell |
Nam Con Son Gas Project - Design, supply, erection and testing of condensate tanks, firewater tanks and process tanks. |
Vietnam |
$2.1m |
August 2008 |
| Roc Oil |
Roc Oil – Design, Supply and Construct Oil Storage Tanks. |
Dongara, WA |
$5.0m |
Prior June 2007 |
| Chevron |
Barrow Island -Tank Refurbishment. |
Barrow Island, WA |
$4.0m |
Prior June 2007 |
| Mining |
| Chirano Gold |
Chirano Gold Mine Expansion – Inclusive of additional CIL circuit and processing equipment to double plant output. |
Chirano Gold Mine, Ghana, West Africa |
$10.0m |
September 2009 |
| Gold Fields Ghana Ltd |
Tarkwa Gold Mine CIL Expansion Project – Design and Construct CIL Tanks, Thickeners & Process Tanks, Install Structural Steel, Mechanical Equipment, Plant Piping and Tailings Piping for 500,000 tpm upgrade project. |
Tarkwa, Ghana |
$38.0m |
March 2009 |
| BGML (Boddington Gold Mines Ltd) |
Boddington – Design, supply and installation of CIL tanks and various other process tanks. |
Boddington, WA |
$20.0m |
December 2008 |
| Barrick Gold / Merit Engineers |
Paste Backfill Plant – Supply, fabrication and installation of complete backfill plant inclusive of electrical work. |
Plutonic Goldmine, WA |
$3.0m |
December 2008 |
| Terramin Australia |
Angas Zinc Project - 400,000 tpa processing facility and associated infrastructure. |
60 km south east of Adelaide. |
$35.0m |
July 2008 |
| Jabiru Metals Ltd |
Jaguar Copper/Zinc Project - Complete processing facility construction across all disciplines including the civil, structural, mechanical, piping and electrical works. |
50 km north of Leonora in Western Australia |
$25.0m |
July 2007 |
| Design & Construct |
BHP Billiton |
Ravensthorpe – Design, supply and installation of various carbon and stainless steel tanks inclusive of coatings such as rubber and corrocoat lining. |
Ravensthorpe, WA |
$15.0m |
Prior June 2007 |
| Chirano Gold/ Lycopodium |
Chirano Gold Mine – Supply, fabrication and installation of the Chirano Gold Mine processing facilities. Inclusive of crushing circuit, CIL circuit, ball mall installation and gold room. |
Chirano Goldmine, Ghana, West Africa |
$9.0m |
Prior June 2007 |
| WMC/ Lycopodium |
Mount Keith – Concentrate Quality Improvement Project. |
Mount Keith Nickel Mine, WA |
$3.0m |
Prior June 2007 |
| Oil & Gas |
| Austrian Energy |
Cogeneration Plant – All in ground services and foundation work. |
Collie, WA |
$20.0m |
|
| Woodside |
Woodside Pluto Stage 2 – Design and construction of four workshops, access roads and associated earthworks. |
Karratha, WA |
$32.0m |
July 2010 |